|
01
Development Route
|
Preferred OEM, ODM or private-label route, or confirmation
that the route is undecided. |
Recommended route, feasibility limits, assumptions and
missing information. |
|---|
|
02
Product Reference
|
Drawing, reference sample, target capacity, dimensions or
closest existing SKU. |
Production drawing, revision number and identified
critical dimensions. |
|---|
|
03
Material & BOM
|
Material preference, coating or barrier, colour,
thickness, component list and restricted substances. |
Proposed BOM, available grades, technical limitations and
substitution rules. |
|---|
|
04
Critical Dimensions
|
Length, width, height, capacity, rim diameter, wall
thickness, interfaces and fit requirements. |
Manufacturing tolerances, measurement points and
inspection method. |
|---|
|
05
Use Conditions
|
Food type, oil and moisture level, fill temperature,
holding time, freezer or reheating conditions. |
Recommended structure, stated performance boundary and
required tests. |
|---|
|
06
Component Compatibility
|
Required lid, base, cup, straw, cutlery, sleeve or
dispensing-system interface. |
Compatibility check, fit test, closure method and approved
component code. |
|---|
|
07
Performance Criteria
|
Leakage, grease resistance, stacking, compression,
bending, closure, transport or drop-test requirement. |
Test method, sample size, acceptance criteria and
test-report format. |
|---|
|
08
Artwork & Colour
|
Editable AI or PDF artwork, Pantone references, colour
count, print area and non-print zones. |
Print method, plate cost, print tolerance, proofing route
and colour-approval method. |
|---|
|
09
Claims & Documents
|
Destination market, intended claim, required declarations,
test reports and certificate expectations. |
SKU-matched document list, certificate scope, identified
gaps and any new testing requirement. |
|---|
|
10
Packing & Logistics
|
Units per pack, packs per carton, barcode, pallet and
carton limits, mixed-loading plan and destination port. |
Pack specification, carton dimensions, loading estimate
and identified space-efficiency trade-offs. |
|---|
|
11
Inspection & Traceability
|
AQL, third-party inspection, COA, retained-sample and
batch-record requirements. |
Inspection plan, batch coding, retained records and
release documentation. |
|---|
|
12
Tooling & Assets
|
Whether existing tooling is acceptable and whether
exclusivity or buyer ownership is required. |
Tooling stages, fees, ownership terms, maintenance,
storage and transfer conditions. |
|---|
|
13
Commercial Forecast
|
Launch quantity, annual volume, seasonal pattern, forecast
frequency and requested delivery date. |
MOQ, price breaks, development timing and available
production window. |
|---|